Permanent formwork systems have become an attractive alternative to conventional masonry block, precast concrete and in situ building methods for both builders and designers in Australia, particularly in the multi-residential space.
Please visit our website for more information on this topic.
Suppliers and manufacturers of the systems herald them as the next big thing in construction, promising quicker project turnarounds, reduced costs, and cleaner and safer construction sites.
While they do vary slightly in their size, assembly methodology and capability, systems generally come as lightweight hollow panels or blocks that join together to form walls that are then core filled with concrete and steel.
They require little bracing compared to in situ pours, erase the need for bricklayers and their materials, and require no specialised trades to erectalthough in some instances warranties are voided if accredited installers are not used.
While the systems are comparatively new, they have been around for long enough now to provide sufficient time for the industry to assess their performance against promises from suppliers. So we put the question out there to the industrydo they live up to the hype and are they suited to single dwelling construction?
When asked, Cameron Lovett of Sydney-based construction outfit, Lovett Custom Homes initially said yes. But that soon changed to a well, sort of, and then an actually, not quite.
Look, I love the idea of the system, or using anything that can replace the messy trades of brick and blockwork on site, he says.
But I just dont think theyre quite there yet.
Like a lot of Australian residential builders, Lovett and fellow Sydney builder Mitchell Levett of Cadence & Co, one of Sydney's premier residential design and construction companies, are seeing permanent formwork systems on construction drawings more and more, and are also aware of their increasing popularity around building sites in general.
We almost always use Dincel now, says Levett, who has worked on some of the most expensive new houses on Sydneys Northern Beaches including the recently completed Palm Beach House (pictured below).
And I dont see us ever going back if we can help it.
Palm Beach House by Cadence & Co employs the Dincel Construction system for structural walls and retaining walls.
Dincel (pictured right), as Levett refers to, is one permanent formwork option available in Australia that claims to be a fast, cheap, and easy alternative to block/brickwork and precast and in situ concrete building methods.
It comes as a set of lightweight hollow polymer panels, floor tracks and specialist pieces that click together to form a waterproof structural wall that is then core-filled with concrete and steel. It comes in either 100 or 200mm thicknesses and has built-in vertical conduits which enable services (except some plumbing) to be installed after all structural elements have been completed, without the need for chasing.
AFS has a similar version called Rediwall (bottom right) and, like Dincel, it is also becoming an increasingly popular among Australian designers. Its offered in 150 or 200mm thicknesses and is erected in a simple channel track system, but unlike Dincel it is not advertised as fully waterproof.
There are others as well which are attracting the attention of some of Australias leading architects, some with high insulating properties and others with easier-to-finish substrates. Ritek's XL Wall system (middle right), which has been used by Reg Clarke Architect (see bottom) and Steele Associates Architects to award winning effect, is one, while Insulated Concrete Forms (ICF) are another altogether.
Unlike PVC versions, Riteks systems use fibre cement sheets for the outer layers of the walls which provide a more traditional surface to finish. These sheets are separated by plastic spaces and bonded to an aluminium track which Ritek guarantees wont rust. The Thermal Wall version also includes an integrated thermal insulation layer which helps it achieve a healthy R-Value of 4.0.
Made popular in America, ICFs are also making inroads into the Australian market. They come as a set of polystyrene blocks that click together like Lego and laid horizontally like traditional blockwork. The EPS provides insulating properties and is also easily cut with a hot knife or grinder to chase services.
Zego Building Systemss ICF (right) is seeing increasing uptake in Australia, particularly by eco architects and designers, and was used on the recently completed Blue Mountains House by Blue Eco Homes (pictured above) which was the recent recipient of a HIA Green Smart Award. It features a dovetail groove for render and plasterboard support which solves some of the finishing issues associated with PVC permanent formwork.
It comes in 300mm heights and doesnt need to sit on a slab rebate which makes it easy to make standard wall sizes like 2.7 and three metres.
Another thats new to the Australian market is Eco Block, an American-born insulated foam wall system similar to Zego which goes further by incorporating structure, vapour barrier, and battens into one system.
Thermacell and Insulbrick are other highly trusted ICFs that have been used throughout Australia.
Like a lot of designers, both Lovett and Levett were first attracted to permanent formwork because of its associated benefits, and although theyve come across a few issues with the system since, they still suggest that the positives far outweigh the negatives. Some of the problems they have run into are a result of inexperience with the system, but they believe most of the responsibility lies with manufacturers who have exaggerated the positives of their products.
These shortfalls have mainly been around speed of construction, bracing requirements, sizing restrictions, waterproofing performance and ease of erection.
First off, I dont believe theyre waterproof, says Levett, who insisted on this despite CSIRO tests that show that Dincel is in fact completely waterproof and guaranteed by Dincel if installed by an accredited installer.
Weve had so many problems with water getting into the channels and filling up that weve even had to drill out holes in the bottom to empty them of water.
We now waterproof, no matter which system we use.
The promise of minimal bracing and easy to install are also cases of choice words according to Lovett whose high-end residential projects feature a lot of custom windows and doors.
Propping at every window, door, T-intersection and on top of walls can take a lot of time, and we often have to prop full height gaps in a wall because the panels dont meet perfectly in the middle, he says.
And feeding corner, horizontal and vertical bars isnt as simple as it looks.
To be fair, manufacturers like Dincel, Ritek, Zego and AFS do offer joiner, male/female adapter and spacer panels to solve the very problem Lovett first described, and using systems like Zego, which is a horizontally-laid block system, basically erases this issue.
If you are looking for more details, kindly visit Zolo.
To explain further, Lovett follows manufacturer directions by building his formwork from the corners in. Because they come in set widths, in Dincels case 333.3mm, they dont always meet in the middle. As mentioned, manufacturers are aware of this and offer spacers and joiners as solutions, but they too come in set widths so naturally you can run into the same problem.
Theyre not always perfect and its too time consuming to make up a custom panel when a joiner or spacer doesnt work so we just back prop and fill the whole wall, says Lovett.
Manufacturers also recommend building walls that fit their products, but of course this isnt something residential architects necessarily want to hear or do.
Erecting from scaffolding is also out of the question says Lovett, who likened an unfilled Dincel wall to a boat sail on a windy day.
Trying to click a three metre PVC wall together from scaff in a howling southerly is suicide, he says.
We only work from decks.
The structural side of the Cronulla House by Reg Lark Architect (right) involved the use of the Ritek XL wall system. A key benefit on the system is its reduced wall thickness compared to conventional masonry. Photography by DLPhotography
Finishing a polymer based permanent formwork wall can mean rethinking your waterproofing, adhesives and coatings, cladding materials and methods. Weve heard stories of tradies scuffing the surfaces of the PVC walls with a grinder just to get their render to stick, and others about render actually falling off the wall because adhesives couldnt hold the weight of a traditional render build. But the problem here could lie in the render products being used.
Polymer renders that are essentially sand and cement based renders that come in bags are not suitable for PVC formwork systems and only appropriate for absorbent masonry substrates. Several Australian coating companies now offer products that are guaranteed to stick to PVC formwork, some without the need for polymer primers. These are all acrylic-based coatings and include Astec Armatex, Novatex, Dulux Acratex and Taubmans Armawall.
Another alternative is Zegos system which has a patented dovetail groove that enables render and plasterboard to mechanically adhere to the foam. This means no roughing up of the surface is required prior to finishes being applied and no screw holes to set and sand on the plasterboard because it can be stuck directly to the wall. On the flip side of that, sticking plasterboard to the foam is untraditional and will require new skills separate to simply screwing, setting and finishing.
Contrary to some manufacturer claims, Zego managing director Scott Evans also recommends waterproofing basements, no matter which system you use.
Ive been a builder for 35 years and I wouldnt take the chance in a basement, he says.
We have to justify why we recommend waterproofing our walls, but at the end of the day we all hear the stories about other systems failing.
Like the PVC versions, Zego should be waterproofed with a bitumen free membrane and there are several products available on the market that suit most permanent formwork systems. Kuniseal, Xypex and Drizoros Maxseal Flex membranes are a just a few.
That all said, both Lovett and Levett, and others that weve spoken to are certainly on board the permanent formwork freight train. Using permanent formwork for a basement construction instead of a column-slab structural system meant an overall reduction in concrete and steel for a recent job Levett worked on, so he saved both time and money there.
Lovett is currently employing Dincel in lieu of brick for a reverse veneer exterior wall at his newest job in Clontarf, NSW and says this system has great potential as a green building solution considering its thermal mass, waterproofing capability and environmental credentials.
Theyre both also erecting exterior walls at a rapid pace and getting to know how to best sequence trades to come in and work with the walls before or after the concrete pour.
Both agree that the systems are faster to erect, easier to handle, provide a cleaner worksite and can be cheaper in some instances. They only hope that some of the previous problems are solved and that custom panels and more options for curved walls become part of the manufacturer product offerings in the future.
Formwork is one of the crucial criteria in any construction project. Keeping in mind how the formwork impacts the construction time of a project selecting steel formwork becomes everyones choice. Do you know, that 40 to 60% of the total cost of concrete execution and implementation depends on the formwork price, texture, and appearance.
Steel formwork is a type of steel frame that is used to build structures. It is commonly used in construction projects where concrete is not feasible due to its weight or cost. Steel formwork is often used in commercial buildings, bridges, dams, and skyscrapers. In addition to being strong, it is also lightweight and durable. It consists of metal panels that are connected together using steel rods. These panels are then placed over concrete forms, which are temporary structures built around the area where the concrete will be poured. Once the concrete has hardened, the steel formwork is removed, leaving behind a permanent structure. In this blog, we will talk about
Few advantages & disadvantages of steel Formwork Advantages of Steel FormworkWhen we talk about the disadvantages of steel formwork, the advantages surpass the cons. The disadvantages are very much less to discuss. However, after conducting some thorough research we have found these disadvantages of steel formwork;
Steel formwork is known for its durability & fine finishing. Though the initial cost is comparatively higher, in the long term it is worth it. And the reusable property somehow mitigates its cost. There are different types of steel formwork including pre-fabricated steel forms, fabricated steel forms, and custom steel forms. Pre-fabricated steel formwork is the easiest to install. Fabricated steel forms are manufactured at the site where they are going to be installed. Custom steel forms are designed specifically for each project.
If you are considering opting for steel formwork, GRS is your one-stop solution. Being an expert in manufacturing & supplying steel formwork, they are committed to delivering high-quality products for the successful completion of a project.
Want more information on bespoke formwork systems? Feel free to contact us.