Viaflex is proud to have sponsored and attended Demo Day . We are honored that the Viaflex Vaporblock material was used for concrete pouring demonstrations. Thank you, American Construction Supply & Rental, for hosting another successful event. Reach out to Viaflex or American Construction Supply for your VaporBlock needs.
If you want to learn more, please visit our website ecogeox limited manufacturer.
Density ASTM C
~ kg/m³
Felxural strength ASTM C
>15 Mpa
Compressive strength ASTM C109
>30 Mpa
Durable service life
> 30 Years
Material
Concrete, PP & PE
Thickness
5-15mm
Roll Width
1m, 2m or customized
If you are looking for more details, kindly visit ecogeox manufacturer.
Roll Length
5-20 m or customized
Weight
8-18kg/m2
Package
Roll in bag
Original
Dezhou, China
Concrete erosion control mats features:
Concrete erosion control mats are highly durable and can withstand extreme weather conditions, such as heavy rain, high winds, and freezing temperatures.
They are designed to be easy to install, with interlocking sections that can be quickly assembled on-site.
The concrete erosion mats are resistant to UV rays and do not degrade over time, ensuring long-lasting protection against erosion.
Concrete erosion control mats applications:
Slope protection: Concrete erosion control mats can be used on steep slopes to prevent erosion caused by rain or other water flow.
Channel lining: They are also effective for lining channels and culverts to prevent erosion and protect the surrounding soil.
Embankment stabilization: The concrete erosion mats from
EcoGeoX
can be used to stabilize embankments and prevent erosion caused by heavy traffic or water flow.
Installation Instructions
1. preparation work First, we must plan and measure to ensure a certain slope so that the water flow can flow smoothly from the upper end to the lower end. Secondly, after the construction site is cleaned and leveled, the construction line is set according to the design drawing, and the drainage slope is re-measured.
2. excavation Set the construction line according to the design requirements, the sides of the ditch need to be leveled, and the slope inside the ditch must not have any virtual soil and empty holes. It is necessary to treat the water damage parts in a tamping manner, except for debris and gravel in the slope. If necessary, use ash soil for compaction treatment, or grouting and reinforced to seal, and the treated parts are required to have good stability.
3. laying The material can be laid vertically and horizontally. Be sure to level the substrate, otherwise it will affect the appearance quality!
4. seam processing
4.1 The lateral width of the adjacent two cement blankets is 10cm wide and the depth is doubled. Place the cement blanket joint at the stack and flatten it.
4.2 Press the cement blanket above the cement blanket in the direction of the water flow, and the superimposed area shall not be less than 10cm.
4.3 Evenly apply sealant at the seam.
4.4 Fix two pieces of cement blanket with 5*38mm stainless steel screws
4.5 groove along the treatment Fix the edge of the material on the edge of the groove with rivets, and fix it with rivets, fix it and use it. The soil covers the edge.
4.6 watering solidification Before the watering, it is necessary to inspect and check the whole of the laying. After passing the water, it can be watered! It needs to be watered 9kg (thickness is calculated in 10mm) to be poured, and it must be poured less, evenly from the edge to the middle. Sprinkle water, preferably by spraying, the flow rate is ml/min until the color of the cement blanket becomes darker. Do not use a water column with a high pressure! Do not step on the water after pouring water. When the temperature is 5 °C, take insulation measures. When the average temperature of day and night is higher than 30 °C, the surface should be covered with plastic film or geotextile,etc. Keep wet, watering and curing time should not be less than 3 days.
For more information, please visit ecogeox geosynthetics supplier.